Wednesday, September 2, 2009

Cabinets Installed

The cabinets are almost installed. The electricans came this AM and did the stove, and Microwave Plugs.

The installers were here by 9 and just went for a lunch break. It's 12:30
and when they come back they will put on the trims and such. On each side of the sink are the large
double lazy susans. I think that is my favorite thing.

I still have the electricans coming back, the plumber and the counter top people.. It's getting there.
A lot has been done in 3 days...

Posted by Picasa

No comments: